Cured floor
Construction requirements for hardened flooring
It is necessary to ensure that the curing agent is adequately penetrated and that the reaction time is sufficient. The operation must strictly follow the sequence of "coarse grinding → penetration → fine grinding → polishing" to avoid material residue.
热品推荐 /HOT PRODUCT

Floor coating

Preparation for the use of floor paint

Phone E-mail SMS Map